To simplify navigation the following are the topics covered in this section; Section 4.6.1.2, “, Menu”Section 4.6.1.3, “Scheduled Transactions Toolbar Buttons”, Section 6.12.1, “Scheduled Transactions Window”. Section 6.13, “Edit Scheduled Transaction Window”,
The detailed explaination of scheduling transactions is described in Section 6.12, “Scheduling Transactions”.
This window is shown when Menubar. This will open a new tab window with the Scheduled Transactions displayed.
→ → is selected from theTable 4.27. Components of the Schedule Transactions Window.
Component | Description | ||||
---|---|---|---|---|---|
Menubar | Contains the Menus used in the Schedule Transactions Window. It provides the standard list of Menubar options and an additional option, Scheduled, which presents options; New, Edit or Delete. If no transaction is highlighted Edit and Delete will be "grayed out". | ||||
Toolbar (Icons and/or Text) | Contains buttons used to access Schedule Transitions tasks. | ||||
Tabs | Tabs to switch between open displays. | ||||
Transactions | The Transactions pane contains a list of transactions scheduled and related characteristics. | ||||
Upcoming | The Upcoming pane contains a calendar of the next months In this calendar the days in which one or more transactions are scheduled, are highlighted with a circle. You could change the time interval displayed in the calendar by selecting a different period from the View: drop down list on the right.
|
The following table describe the Menubar when you are in the Scheduled Transaction window.
menu options available in theTable 4.28.
Menu - Access to scheduled transaction editing operations.Menu Item | Description |
---|---|
Add a new schedule transaction. | |
Edit the currently selected transaction. | |
Remove the currently selected transaction. |
The Scheduled Transactions window has a Toolbar to quickly access some common functions used with scheduling.
Table 4.29. Scheduled Transactions Window Toolbar
Toolbar Button | Description |
---|---|
Ctrl+S) ( | Save the current schedule of transactions. |
Ctrl+W) ( | Close the Scheduled Transactions window. |
Add a new scheduled transaction. | |
Edit the currently selected transaction. | |
Remove the currently selected transaction. |